Evaporation Pond

Services: Engineering and Project Management

Project Summary: In order to remove plant washings from a 5 mega litre storage tank, NeuBau has designed and managed the construction of an evaporation pond. Strict environmental conditions were adhered to ensure that there was no risk of contamination to the surrounding environment. Features of the pond include clay under liner, dumping point for vacuum truck, weir and sump complete with pontoon pump and oil boom.

Projects

  • Default
  • Title
  • Date
  • Random