Stormwater Harvesting for Beneficial use Gibson Island Brisbane

Services: Engineering and Project Management

Project Summary: A major fertiliser and industrial chemical manufacturing company located on the Brisbane River was discharging storm water contaminated with fertiliser (N,P & K) products into the Brisbane River. The project involved retro fitting pumps, piping and instrumentation to existing stormwater outlets and the construction of an 18ML HDPE lined storage pond. Stormwater is collected then treated and used on site. The project won the Queensland Healthy Waterways Industry awards and The Fertilizer Industry Federation Platypus Environmental Award. 

View PDFAdobe-pdf-icon-small



Stormwater collection

Projects

  • Default
  • Title
  • Date
  • Random